Solution overview · Renovation & construction

Zoho CRM and Zoho Books for Construction: Every Quote, Change Order and Stage Invoice on One Job Record

How a renovation and light commercial contractor can take a job from estimate to final payment without retyping quotes, losing change orders or tracking retention in a notebook.

IndustryResidential renovation & light commercial
Example businessContractor with estimators, project managers and a small office
BillingDeposit, stage invoices, retention
Zoho appsZoho CRM, Zoho Books, Zoho Sign

Zoho CRM and Zoho Books for Construction: Quote to Paid

Each document is created from the one before it, so the contract value never gets retyped

Zoho CRM logoZoho CRM Zoho Sign logoZoho Sign Zoho Books logoZoho Books
1
Zoho CRM logo
Quote

Lines from products

2
Zoho Sign logo
Sign

Contract signed

3
Deposit

Retainer invoice

4
Zoho Books logo
Stage invoices

From the sales order

5
Change orders

Signed, then billed

6
Final

Retention released

Open jobs (sample)
Kitchen and rear extensionStage 2 invoiced · Deposit applied
On schedule
Dental clinic fit-outCO-014 signed · Add to next invoice
CO unbilled
Every job shows
ContractWith COs
BilledTo date
RetentionHeld
Renovation and fit-out contractorsJobs sold on a quote, billed in stages
1 job recordA CRM deal from estimate to final payment
Signed change ordersApproved by the client before work starts
Deposits appliedRetainer invoices offset against stage bills
Retention trackedHeld on each invoice, released at completion

Zoho CRM and Zoho Books for construction join the two halves of a contractor’s money: the quote the estimator wins and the invoices the office sends while the job is built. When they share one job record, every change order and every stage invoice traces back to the signed contract.

This overview uses an example business: a residential renovation and light commercial contractor with estimators, project managers and a small office team. It covers the problems, the design, the construction quote to payment flow, progress billing, change orders, retention and the rollout. Job names and figures in the screens are sample data.

In brief

When estimates live in spreadsheets, change orders are agreed on site by voice and retention is written in a notebook, a contractor bills late and sometimes not at all. Zoho CRM and Zoho Books for construction give each job a deal with a quote, a signed contract, a deposit, stage invoices drawn from one sales order, signed change orders and a retention balance, all visible to the office and the project manager.

At a glance

Quick summary

Who it suits

Renovation and fit-out contractors that bill in stages

Zoho apps

Zoho CRM for jobs and quotes, Zoho Books for billing, Zoho Sign

Problem

Retyped estimates, unbilled extras, missed stage invoices

Setup

Job deals, quotes, signing, retainers, stage lines, change orders

Outcome

Contract, billed, collected and retention per job

01
The challenge

The challenge: estimates retyped and extras never billed

In the example contractor, an estimator prices a kitchen and rear extension in a spreadsheet, saves it as a PDF and emails it. When the client accepts, the office retypes the totals into an accounting package to raise a deposit. Three weeks in, the client asks for an extra window on site, the project manager says yes, and nobody writes it down.

Zoho CRM and Zoho Books for construction: a builder in a hi-vis shirt cuts plywood sheets on sawhorses inside a timber-framed renovation of an old brick building
A builder cuts sheathing inside a renovated shell, where small extras agreed on the day add up over a job. Photo: rawpixel, CC0

The final invoice is built from memory. The extra window is missing, a stage invoice went out late, and the retention sits in a notebook. There is no progress billing routine, only reminders.

Estimates retyped

Spreadsheet totals are copied into invoices by hand, with mistakes in quantities and allowances.

Verbal change orders

Extras agreed on site are never priced, signed or billed.

Stage invoices missed

Deposits and progress invoices depend on someone remembering a stage is done.

Retention in a notebook

Amounts held back by clients are tracked on paper and sometimes never chased.

Before

One job, money in four places

The contract, the extras, the invoices and the retention never meet

Spreadsheet
Estimates
Priced line by line
Version unclear
Retyped later
Site conversations
Change orders
Agreed by voice
No price agreed
No signature
Accounting package
Invoices
Raised by hand
What is still to bill?
How much is held?
Double entry
Unbilled extras
Forgotten retention
Kitchens and extensions Shop and clinic fit-outs Whole-house renovations
Techwave Solutions logo

Before: estimates, site changes, invoices and retention live in separate places (illustration)

02
Root cause

Why renovation contractors under-bill between quote and payment

A renovation job is sold once but billed many times: deposit, stages, extras and retention release, spread over months. With a spreadsheet and an accounting package, each is typed fresh, so the construction quote to payment chain breaks at every handover.

The scope also moves. Walls are opened, clients change their minds, allowances get spent. A change not priced and signed when agreed is hard to bill later, because the client remembers it as included.

Week 1

Estimator

Wins the job. The office retypes the quote into a deposit invoice.

Week 4

Project manager

Agrees an extra window on site. Means to tell the office. Forgets.

Week 12

Office

Builds the final invoice from memory. The window and the retention release are missing.

03
The decision

Why Zoho CRM and Zoho Books for construction, instead of spreadsheets

A better estimate template still leaves quote, extras and invoices apart, and a full construction suite brings site tools a small contractor may not need. Zoho CRM and Zoho Books for construction sit between: CRM holds the job, quote and change orders; Books holds the deposit, progress billing, payments and the ledger.

The integration syncs customers and shows Books transactions inside CRM. One point shapes the design: CRM Quotes module records do not sync to Books documents, so a small function carries the accepted quote across. That keeps the construction quote to payment flow a chain of conversions.

Spreadsheet plus accounting package

  • Every quote retyped
  • Extras agreed by voice
  • Stages remembered, not scheduled
  • Retention on paper

Zoho CRM with Zoho Books

  • Quote lines from a product list
  • Change orders signed in Zoho Sign
  • Stage lines invoiced from one sales order
  • Retention held and released per job
04
The solution

The solution design: progress billing tied to the signed quote

In Zoho CRM and Zoho Books for construction, every job is a CRM deal and every bill a Books document created from it. Editions and integration plan requirements are confirmed in discovery.

Zoho CRM logo

Job deals

Estimator, site address, job type, contract value and stage, on one deal per job.

Quotes from products

Labour, materials, subcontract and allowance products, with payment terms.

Zoho Sign logo

Signed contracts

The accepted quote and contract signed by the client through Zoho Sign.

Deposit retainers

A retainer invoice in Zoho Books, applied to stage invoices as they go out.

Stage sales order

One Books sales order per job with a line per billing stage, invoiced stage by stage.

Change Orders module

A custom CRM module linked to the deal, signed by the client, then billed.

Progress billing

From signed quote to stage-by-stage invoices

The sales order holds the stages; each invoice takes only the stage that is done

Zoho CRM and Zoho Books for construction: main workflow viewJob dealWon
Kitchen and rear extension
Job typeResidential renovation
QuoteQ-0412, signed 12 Feb 2024
EstimatorEstimator A
Contract valueSample
Sales order
Zoho CRM and Zoho Books for construction: management dashboardSO-00087 stagesPartially invoiced
2/4
Demolition and groundworkInvoiced
Framing and roofInvoiced
First fix and plasterNext
Lines from the quote Deposit applied per invoice Retention held per invoice
Techwave Solutions logo

A won job deal and its stage sales order, two stages invoiced (illustration, sample data)

05
The implementation

The implementation: construction quote to payment, step by step

Each step of the construction quote to payment flow is described by trigger, data and next step. People still price work; the system turns each agreement into an invoice.

1

A deal for every job

Trigger: a client asks for a price. Data: client account, Estimator, Site Address, Job Type (kitchen, extension, whole house, fit-out) and Contract Value. Next: the deal moves through stages such as Site Visit, Estimating, Quote Sent and Won, so the office sees every job in the pipeline before work starts.

2

Quotes built from products

Trigger: the estimator prices the job. Data: CRM Products for Labour, Materials, Subcontract and Allowance, each with a unit price, plus payment terms listing the billing stages. Next: a CRM quote is created on the deal with those lines. Allowances are separate lines, so if the client picks a dearer worktop the difference becomes a clear change order.

3

Quote and contract signed through Zoho Sign

Trigger: the client is ready to commit. Data: the quote PDF and the contract terms. Next: both go out for signature through Zoho Sign from the CRM record, the signed copy is stored on the deal, and the deal moves to Won.

4

Won deal creates the job in Zoho Books

Trigger: the deal stage changes to Won. Data: the client account, the signed quote lines and the billing stages. Next: the CRM and Books integration syncs the client as a customer, and a Deluge function creates a sales order in Books with one line per billing stage and the job number as reference. This is the start of progress billing.

Construction quote to payment

Four documents, each made from the last

Converted, never retyped

1
Quote

Signed by the client

Zoho CRM logoZoho CRM
2
Retainer

Deposit paid

Zoho Books logoZoho Books
3
Sales order

One line per stage

Zoho Books logoZoho Books
4
Stage invoice

Paid online

Zoho Books logoZoho Books
Signed change orders join the next stage invoiceAn extra cannot be forgotten, because it waits on the job as approved and unbilled
EstimatorProject managerOffice
Techwave Solutions logo

The construction quote to payment flow across Zoho CRM and Zoho Books (illustration)

5

Deposit as a retainer invoice

Trigger: the contract is signed. Data: the deposit amount from the payment terms. Next: the office raises a retainer invoice in Zoho Books. Once paid, it waits as an available retainer and is applied to stage invoices, in full or in part, with Apply to Invoice. Progress billing then starts from a known deposit balance.

6

Progress billing from the sales order

Trigger: the project manager marks a stage complete on the deal, which creates a task for the office. Data: the job’s sales order. Next: the office uses Convert to Invoice, keeps only the finished stage line and saves. Books marks the sales order Partially Invoiced, and its Invoices tab lists every stage billed. Progress billing becomes a routine conversion, not a calculation done from memory.

7

Change orders signed before the work

Trigger: the client asks for something not in the quote. Data: a record in the Change Orders custom module, linked to the deal: Description, Reason (client request, hidden condition, allowance overrun), Amount and Status. Next: the project manager sends it for signature through Zoho Sign from a phone on site. When signed, Status becomes Approved, Unbilled, and the deal’s Contract Value is recalculated to include it.

8

Approved change orders on the next invoice

Trigger: the next stage invoice is prepared. Data: change orders on the deal with Status Approved, Unbilled. Next: each one is added as a line on the stage invoice, and a function stamps the invoice number on the change order and sets it to Billed. A list of unbilled approved change orders is reviewed weekly, so none are left behind.

9

Retention held, then released

Trigger: the contract allows the client to hold back part of each payment. Data: a Retention Held custom field on each invoice and a negative Retention line mapped to a retention receivable account agreed with the accountant. Next: the job’s running retention balance builds up invoice by invoice. At practical completion, the final invoice releases it with a positive Retention Release line, and the balance returns to zero.

10

Online payment, status back on the deal

Trigger: a stage invoice is emailed. Data: the payment gateway connected to Zoho Books. Next: the client pays from the invoice link, the invoice shows Paid in CRM, and a function updates Billed to Date and Collected to Date on the deal, closing the construction quote to payment loop.

06
Reporting

The job dashboard: contract, billed, collected and retention

Every figure comes from a signed quote, a change order or an invoice, so no spreadsheet sits behind it. Four numbers per job cover the weekly review of Zoho CRM and Zoho Books for construction.

Contract value

The signed quote plus approved change orders.

Billed to date

Stage invoices and change orders invoiced so far.

Collected and outstanding

Payments received, and what is still owed.

Retention held

The amount the client is holding until completion.

Zoho CRM dashboard

Every job’s money at a glance

Built from the deal, the change orders and the Books invoices

Change ordersUnbilled flagged
RetentionPer job
Zoho CRM logoOpen jobs
Mar 2024All job types
Contract valueSampleIncl. change orders
BilledSampleStages invoiced
OutstandingSampleBy due date
RetentionHeldTo release
Billed vs contract by job (sample)
Change orders by reason
Client · Hidden · Allowance
Days from stage done to invoice
Kitchen and rear extensionSO-000872 of 4Paid to date
Dental clinic fit-outSO-000911 of 4CO unbilled
Loft conversionSO-00079CompleteRetention due
Techwave Solutions logo

Example open jobs dashboard in Zoho CRM with Books figures (illustration, sample data)

The owner starts with two lists: approved change orders not yet billed, and finished jobs with retention still held.

07
The results

What changes, and how to measure it

There is no measured baseline for this example, so the table lists intended changes from Zoho CRM and Zoho Books for construction to check after a pilot.

Area
Before
Expected after setup
Quotes
Spreadsheets retyped into invoices
Quote lines carried into a sales order
Change orders
Agreed by voice
Priced, signed and billed
Deposits
Raised by hand
Retainer invoices applied to stages
Progress billing
Remembered, sometimes late
Stage lines invoiced on completion
Retention
Notebook
Balance per job, released on the final invoice

Stage to invoice time

Days between a stage marked complete on the deal and its invoice date. Progress billing should make this short and steady.

Unbilled change orders

Count approved change orders older than one billing cycle that are still unbilled.

Retention past due

Completed jobs where retention is still held after the agreed release date.

Retyped invoices

Invoices not created from a job’s sales order. In a working construction quote to payment flow there should be almost none.

08
Day to day

Day to day for each role

Four roles share Zoho CRM and Zoho Books for construction, each with access set to match their job.

Daily

Estimator

Prices jobs from the product list and starts the construction quote to payment flow.

On site

Project manager

Marks stages complete and sends change orders for signature before the extra work starts.

Weekly

Office team

Raises retainers, converts stage lines to invoices, adds change orders and tracks retention.

Weekly

Owner

Reviews contract, billed, collected and retention per job, and chases the outliers.

09
Delivery plan

Rollout timeline for progress billing in Zoho

Zoho CRM and Zoho Books for construction are rolled out in five phases, dated after discovery.

PHASE 1

Discover

Job types, billing stages, deposit and retention terms, roles.

PHASE 2

Products and terms

Labour, materials, subcontract and allowance products; contract templates.

PHASE 3

Configure

Deal fields, Change Orders module, Sign templates, the Books link and functions.

PHASE 4

Test a job

One job from quote to final invoice, with a change order and retention.

PHASE 5

Train and pilot

New jobs in Zoho from a cut-off date; running jobs finish as before.

Two parts need care. The first is the billing stage list. Each job type needs agreed stages that match the contract, because progress billing can only be as clear as the stages written into the quote.

The second is retention accounting, agreed with the contractor’s accountant before the first invoice so the ledger and dashboard match.

10
FAQ

Zoho CRM and Zoho Books for construction FAQ

How is progress billing done in Zoho Books?

In this design, a sales order holds one line per billing stage. Each completed stage is converted into an invoice, and the sales order shows as partially invoiced until every stage is billed.

Do CRM quotes flow into Zoho Books automatically?

Customers sync through the integration, but CRM Quotes module records do not become Books documents on their own. A Deluge function creates the Books sales order when the deal is won.

How are change orders approved?

Each change order is a record linked to the job deal and is signed by the client through Zoho Sign before the work starts.

How is the deposit handled?

As a retainer invoice in Zoho Books. Once paid, it is applied to stage invoices in full or in part.

Can the project manager see what has been paid?

Yes. With Zoho CRM and Zoho Books for construction, invoice status shows in CRM and the deal carries billed, collected and retention figures.

11
Work with us

How Techwave Solutions can help

Techwave Solutions is an Authorized Zoho Partner working with Zoho since 2015. We set up Zoho CRM and Zoho Books for construction and other project-billed trades: job deals, product-based quotes, Zoho Sign templates, change order modules, retainers, stage sales orders, retention handling and staff training.

Learn more about Zoho Books, see a related setup in our Zoho CRM for real estate overview, or book a free first call with a Zoho consultant to map your own quote to payment process.

Talk to a Zoho consultant

Baliaghatta, Godagari, Rajshahi, Bangladesh
Get started

Choose the Zoho plan that fits your firm

Zoho Books runs the deposits, stage invoices, payments and retention in this design. Zoho CRM holds the jobs, quotes and change orders, and Zoho One brings both together with Zoho Sign.

Zoho Books logo
ZohoBooks

Retainers, stage invoices, payments and the ledger

Sign up for Zoho Books
Zoho CRM logo
ZohoCRM

Job deals, quotes and change orders

Sign up for Zoho CRM
Best fit for this setup
Zoho One logo
ZohoOne

CRM, Books, Sign and the rest of the suite

Sign up for Zoho One

Partner sign-up links from Techwave Solutions, an Authorized Zoho Partner.

This is a solution overview built around a composite example. Business details and dashboard figures are examples, not results reported by a specific client.